在线视频国产欧美re99在线观看|av免费观看在线天堂精品一品2品|产精久久久久久91嫩草综合精品|人人鲁人人爽人人99丝袜在线网站|亚洲黄色免费网站秒播亚洲人成网站|99久久熟女国产精品一级片|97午夜剧场簧片在线看免费|www.四虎精选91在线

NewsHome > News > Industry dynamics

Secret Record of Maintenance and Maintenance of Grazing Machine
release time:2019-3-28 15:49:00      hit count:1803

Daily pre-start check

1. Check oil and coolant leakage, record tire damage, hose extrusion deformation, bolt loosening or edge wear.

2. Removal of debris, residues and garbage from loose areas of bulldozers or discs

3. Check and ensure that the bulldozer slides and the top surface of the disc are clean.

4. Ensure that the safety signs are clean and in good condition. If damaged, lost or blurred, replace in time.

5. Clean the cockpit glass and check that all rearview mirrors are in place.

6. Before starting the grader, make sure that all the tools and other unfixed items on the machine are clear.

7. Visual inspection of brake fluid level through translucent main cylinder container. The liquid level should be at the flange of the container, not more than 1 inch from the top of the cap.

8. Check once a week or 50 hours of work. The daily pre-startup inspection method should also be used during the inspection.


Previous: Precautions for cement pavement construction: preparation before paving
Next: What if the drill pipe of rotary drilling rig drops slowly?

Back to list

News you are interested in
南阳市| 南郑县| 鸡东县| 天柱县| 那曲县| 京山县| 东至县| 黄陵县| 吴桥县| 龙川县| 二连浩特市| 阳原县| 诸城市| 嘉禾县| 赫章县| 新津县| 堆龙德庆县| 晋城| 承德市| 社会| 宾川县| 赣州市| 丰台区| 永仁县| 镇江市| 乐山市| 建瓯市| 宝坻区| 凌源市| 义乌市| 法库县| 绵竹市| 瓮安县| 高台县| 阜新市| 渝北区| 焦作市| 巴里| 宝坻区| 东兴市| 大同市|